Full Rewire with Generic Loom and New Regulator

Full Rewire with Generic Loom and New Regulator

Vehicle: 1970 Steyr-Puch Haflinger

Status: Complete

Priority: High

Estimated Time: 20 hours

Estimated Cost: $850

Category: Electrical


Task Description

Complete electrical system overhaul including installation of a generic wiring loom, new voltage regulator, and updating all electrical connections. This major task will modernize the electrical system and eliminate age-related wiring issues.

Parts Required

  • Generic/universal wiring loom kit
  • Voltage regulator (12V)
  • Fuse box (blade type preferred)
  • Electrical connectors (various)
  • Heat shrink tubing kit
  • Electrical tape
  • Wire loom/conduit
  • Terminal blocks
  • Crimp terminals
  • Switch panel (if updating)
  • Relays for lights and accessories
  • Battery terminals and cables

Tools Needed

  • Wire strippers
  • Crimping tool (ratcheting type preferred)
  • Soldering iron and solder
  • Heat gun
  • Multimeter
  • Circuit tester
  • Wire routing tools
  • Drill and bits
  • Label maker or tags
  • Cable ties

Procedure

Planning Phase

  1. Document existing wiring with photos and diagrams
  2. Test all existing circuits to understand requirements
  3. Plan new loom routing
  4. Create wiring diagram for new system

Removal Phase

  1. Disconnect battery
  2. Remove old wiring harness completely
  3. Clean all grounding points to bare metal
  4. Remove old fuse box and switches if replacing

Installation Phase

  1. Install new fuse box in accessible location
  2. Mount new voltage regulator
  3. Route main power cables from battery
  4. Install main ground straps (battery, engine, chassis)
  5. Route new loom following planned path
  6. Secure loom with clips every 30cm
  7. Connect alternator and regulator wiring
  8. Wire ignition switch and starter circuit
  9. Connect lighting circuits through relays
  10. Wire instruments and gauges
  11. Connect horn, wipers, and accessories
  12. Install any additional circuits (USB, 12V outlets)

Testing Phase

  1. Check all connections with multimeter
  2. Verify grounds are solid (less than 0.5 ohm)
  3. Connect battery and test each circuit individually
  4. Check charging system output (13.5-14.5V)
  5. Verify all lights work correctly
  6. Test all switches and controls
  7. Load test system with all accessories on

Documentation

  1. Create final wiring diagram
  2. Label all fuses clearly
  3. Document any modifications for future reference

Notes

This is a major undertaking that essentially rebuilds the entire electrical system. Consider breaking it into smaller sub-tasks if needed. A generic loom will need modification to fit the Haflinger’s specific layout. Keep the original harness as a reference.

Progress Updates

Task updates will be added here as work progresses